This is a building constructed around acoustic environments optimised for learning. The architecture emanates from the production of sound outwards. Every wall is placed, anchored and detailed to intercept, reflect…
A colored and open plan office designed to host the AI team of SENAI/PR in Londrina. An initiative of the National Confederation of Industry (CNI) and the National SENAI conceived,…
Beyond Rest is a floatation centre housed in an industrial warehouse in Collingwood Melbourne. Float tanks are used for both relaxation and rehabilitation purposes by a wide ranging client base.…
When West Carr & Harvey approached us, they had just turned 70, cementing themselves as the oldest accountancy in Geelong. In celebration, they decided to move from their 16-year tenure…
A small-scale duplex apartment situated in suburb of Ahmedabad city, was a 4bhk duplex penthouse that further converted into 3bhk as per clients’ requirements. Colour palette infuses vitality in the…
The New Mazda Headquarters seeks to create and incorporate the latest thinking in workplace design and flexible environments to achieve outstanding cultural and environmental design outcomes for the clients. Project…
The Fortitude Valley State Secondary College is the Queensland Government’s first true vertical school and the first new inner city high school built in 60 years. The campus actively extends…
This villa of 700 m2 is located in the luxurious Quinta da Marinha, in Cascais. The intervention intends to rehabilitate an existing house, changing its deteriorated image and endowing it…
The refurbishment of Cardno’s APAC North Headquarters has delivered cultural and physical change. The journey began with the application of a strong planning overlay that served to underpin the emergence…
The re-imagining of Canberra’s St Christopher’s Cathedral Precinct emerged from a desire to unite the many functions of the Church into one central location. The Archdiocese administration, a community hall,…
Once a cramped, dark and poorly configured space, an entire re-design was required in order to create the openness the client desired. The overall objective was to have one continuous…
This project is a vibrant temporary decanting facility with a 3-5 year lifespan, allowing refurbishment of other Monash College buildings during a high growth period, to then be dismantled to…






