A brief for a temporary building is usually one line long. A sports hall for the eighteen months the old one is closed. A reading room for the years a college spends as a building site.

The design that follows tends to answer that first need well and stop there. Yet a demountable building may change use halfway through its stay, move to another town or come apart into components that wait in a yard for another project. Each of those later lives depends on decisions made before the first one begins.

Why should temporary architecture be designed beyond its first use?

Because a building’s first site rarely gets all of its working life. A temporary project has three lifespans. There is the occupation of the first site, the life of the assembled building and the longer life of its frame, panels and services.

Neptunus, which manufactures demountable modular building systems, offers them for anything from a few months up to 20 years of use. ‘Temporary’ describes the commission, not the hardware.

Components sized, fitted out and connected for a two-year brief alone become harder to reuse than they need to be. Write the end-of-use scenario into the brief next to the opening date. The building might stay, convert, move or be dismantled into stock, and each answer changes the drawings.

The first site shapes how easily a building can leave

Before a temporary building can adapt to anything, it has to arrive, and the route in often shapes the design more than the elevations do.

At Trinity College, Oxford, the only way in was through ornate listed gates. Standard cranes and forklifts could not be used, so Neptunus brought in specialist plant to erect a 500 square metre Flexolution II building on a confined footprint.

On a walled or occupied site, the way in is usually the way out. A structure that can be dismantled in principle but cannot be lifted back out is not reversible in practice. Component sizes, lifting methods, foundations, service connections and the condition the land must be returned in belong in the first design conversation.

Flexibility is more than an open floor plan

An empty hall looks flexible. Whether it can change use depends on what sits in its walls, ceiling and floor.

The Oxford building had a change of use written into its contract. It would serve two years as a library reading room and multi-functional space, then a final year as a kitchen, dining room and senior common room.

Those two programmes share little beyond a roof. A reading room needs quiet, even light and plenty of power outlets. A kitchen needs drainage, extraction, hard-wearing floors and a different approach to fire risk. A design that anticipates the switch keeps service routes and partition lines where they can be reached and altered without stripping the building back to its frame.

Sketch one credible second use over the plan before the layout is fixed. Where it fights the first, the conflict usually sits in the services rather than the walls.

What makes temporary architecture easier to dismantle and reuse?

Reversibility comes down to how parts are joined and whether they separate without damage. Bolted, screwed and slotted connections can be undone. Adhesives, sealants and wet trades generally cannot. ISO 20887:2020 builds its disassembly guidance around independence between parts, easy access to components and services, and standardised design.

Neptunus’s modular systems use screw and slide connections and dry construction with no glue or sealant, so assembly involves no sawing or drilling.

The weak points are often below ground or behind the linings. A bolted frame on cast-in-place concrete still leaves a slab to break out. Cables and pipes chased into finishes turn a simple disconnection into demolition. Design for disassembly has to reach the foundations and services as well as the frame.

The useful question is which components could be left intact on the last day. Prefabrication alone does not answer it.

Temporary use still needs permanent standards of comfort

A short tenancy does not lower the standard of the room. A student revising for exams notices poor acoustics, overheating or a step at the entrance as quickly as in any permanent building. A pavilion visited for an afternoon can tolerate heat and echo. A room used every day cannot.

The Oxford project shows where the effort sits. A six-strong crew erected the structure in two weeks. The fit-out, with stud walls, a suspended ceiling, heating, air conditioning, plumbing and fire alarms, took five more.

Most of the time went into the layer occupants experience, and every lining, duct and insulation panel in it has to come out again. Those elements need the same attention to fixings and separation as the frame, or the comfortable building becomes the one nobody can reuse.

The real test comes when the building is no longer needed

In 2014 Neptunus supplied a temporary sports hall to Lorentzweiler in Luxembourg while the town renovated its permanent hall. When that finished, neighbouring Strassen needed cover for its own refurbishment. The hall was dismantled and rebuilt 13 kilometres away to the same design and dimensions. Heating, ventilation, lighting and fire alarms moved with it, along with the sports floor and scoreboard. Even the construction drawings were reused.

Two conditions made that possible. The second brief matched what the building already was, and the information needed to rebuild it had been kept. Neither is guaranteed. Components can be damaged in dismantling, sit in storage longer than planned or meet a project that needs a different span. Drawings are easier to lose than steel.

Reuse is not automatically the lower-carbon option either. Transport, storage, refurbishment and operational energy all belong in a whole-life assessment. A credible plan names a likely next destination and keeps the drawings, connection details and condition records someone else will need to rebuild it.

Design the departure as carefully as the arrival

A temporary building must serve its occupants as well as any permanent room would, then leave without waste or damage and be useful somewhere else. Four questions belong in the brief before the design is fixed.

  • What must the building do on its first site, and for how long?
  • What else could it credibly become?
  • How will each component leave the site?
  • Who will keep the records needed to rebuild it?

Architecture is usually judged by what it adds to a place. Temporary architecture should also be judged by what remains useful once the original need has gone.

Author

Swati is a valued part of the in-house team at Re-thinking The Future and Eduwik. She has always been an avid reader, with a strong passion for research and writing. With strong organizational skills and an ability to manage deadlines, she keeps tasks on track while maintaining high standards of quality. She's responsible attitude, attention to detail, and commitment to teamwork make her someone the team can confidently count on.